Skip to main content
Incident-intake demoSimulation

Recover a stopped line, one decision at a time.

Scan the stopped asset, say and show what happened, and watch LineRescue coordinate the approved part, expert, and vendor — with the downtime clock running the whole time.

This is a simulation. No real machine action is taken and no order is placed — nothing is saved. It is a 90-second walk-through of the real recovery flow.

Step 01 / 06

Scan the stopped asset

Point the operator's handheld at the machine's asset tag. This walk-through uses a sample tag — no camera is opened.

Andon status board with a row of green LEDs — all lines stable, no active incidents
No active incident

All lines stable. Scan the sample asset to begin.

Mock QR read — no camera is used
Standby
Downtime
00:00
Value at risk
$0

Sample line rate $260/min · illustrative only

AssetAwaiting scan

Scan the sample asset to load its nameplate.

Recovery sequence
  1. 01Scan assetIdentify the stopped unit
  2. 02Observe
  3. 03Make safe
  4. 04Proposed action
  5. 05Resource match
  6. 06Confirm

Want this recovery path on your real lines?

The 60-day Downtime Resolution Sprint stands it up on two of your lines — no rip-and-replace.

Request the Sprint